Can Repair Logs Forecast Heating Main Failures Ahead of Winter? First Lab Study Results

Using the municipal heating archive "District Heat-01" (designated RIVIXI-HEAT-01: 8,243 pipe elements grouped into 1,920 operating sections), a two-level initial ensemble flags 460 of 490 holdout failures ahead of time, reaching 85% precision in the top 20 sections and a 0.854 ROC-AUC.

We are publishing the findings of our lab's first large-scale applied study, testing whether historical repair logs alone can pinpoint high-risk underground heating mains ahead of the winter operating season. The study uses our private municipal archive "District Heat-01" (designated RIVIXI-HEAT-01), spanning seven years of operational records (2019-2025) across 8,243 individual pipe elements consolidated into 1,920 operational sections.

Real-world utility GIS tables present a practical formatting challenge: individual asset records vary wildly in length, spanning anywhere from less than a foot to several hundred meters. To prevent segment fragmentation from skewing risk scores, we implement a two-level scoring pipeline. At the first level, Gradient Boosting and Random Forest ensembles evaluate each individual element from static engineering specs and past incidents; at the second level, element probabilities aggregate up to the full operational section where crews schedule isolation, testing, and pipe replacement.

On the initial evaluation benchmark across a blind holdout test year within RIVIXI-HEAT-01 (490 failed sections), the risk-ranking model flags 460 failing sections in advance (93.9% recall). Across the top 20 highest-risk entries, 17 experience recorded failures (85% Precision@20), 81 of the top 100 fail on holdout validation, and ROC-AUC reaches 0.854. Currently running as a local research workflow, the model turns passive maintenance logs into concrete inspection schedules.